FUEL GAS CONTROL VALVE RETROFIT TO AGV50

BACKGROUND

One of KKKS operating in East Java has 3 Solar Taurus 60 Gas Turbine Generators. The Gas Turbine Generators experienced a repetitive shutdown due to Fuel Gas Control Valve failure, resulting in limitations and reduced power capacity

MAIN CHALLENGE
  • Compliance and Safety

Valve replacement to be completed as quickly as possible, and will be proven for at least 1000 operating hours.

  • Minimum Downtime

All Modification and fabrication will be done in accordance with company’s industry standard.

  • Reversible Process

Should the retrofit job become unsuccessful, KPO is required to reverse all the changes to its original condition.

BENEFIT
  • Cost Efficiency

Choosing CCC AGV 50 has significant improvement in terms of material price compared to existing valve, potentially would reduce 30% to 50% of current price.

  • Improved Maintainability

CCC AGV 50 utilizes different operating philosophy compared to the existing control valve. AGV 50 Manufacturer through its local agent is able to supply repair kit, parts, instructions and diagnostic software to ensure that customer will be able to maintain the valve.

  • High Local Content and After Sales. Support

PT. Karya Putra Okuli as CCC exclusive partner in Indonesia will give engineering support and after sales support to all CCC product available. This would give easy interactions between customer and OEM.

BEFORE

Solar Taurus 60 Gas Turbine Generator was equipped with Meggit HFG 2.0, with known issues of repetitive engine flame out and fault signals. This valve weighs 190 lbs (86 Kg), utilizes two power supply source, i.e : 24 Vdc and 120 Vdc

DIAGNOSTIC